FH-Dave
07-21-2005, 10:36 AM
There will be emergency scheduled maintenance on both mail1.fluidhosting.com and mail2.fluidhosting.com. The total downtime for the maintenance will be less than or around 5 minutes.
Mail1.fluidhosting.com will be upgaded from P4/2.8 GHz to P4/3.4 GHz. Hopefully this will reduce the load on mail1 as the server is currently processing about 350000 mails delivery per day.
Mail2.fluidhosting.com memory will be upgraded from 512 MB to at least 1 GB if not 1.5 GB. This should help reducing the disk swap activity that has been going on more on mail2.
We will update this thread when we are ready to do the work.
Mail1.fluidhosting.com will be upgaded from P4/2.8 GHz to P4/3.4 GHz. Hopefully this will reduce the load on mail1 as the server is currently processing about 350000 mails delivery per day.
Mail2.fluidhosting.com memory will be upgraded from 512 MB to at least 1 GB if not 1.5 GB. This should help reducing the disk swap activity that has been going on more on mail2.
We will update this thread when we are ready to do the work.